Building departments use PlanCheck for the first pass of plan review. It reads the full permit set, checks it across 12 code domains, and cites every objection to the code section and the sheet, so your examiners can confirm each one in seconds and make the call.
PlanCheck does the cited first pass on every submission. Your examiners check the findings and keep every decision that needs human judgment.
The set goes in. PlanCheck returns cited findings. Your examiners review them and decide what goes to the applicant.
Run PlanCheck on the set before it reaches the counter, then resolve the cited issues while they are still inexpensive to fix.
Not a chat transcript. PlanCheck gives you a cited, structured Notice of Objections with the detail needed to fix or explain each finding.
PlanMinds| # | Domain | Sheet | Code § | Finding | Status |
|---|---|---|---|---|---|
| 01 | Egress | A-201 | IBC 1017.2 | Common path of travel 118 ft exceeds 100 ft maximum for Occupancy B. | Objection |
| 02 | Accessibility | A-401 | IBC 1010.1.1 | Clear door width 30 in below 32 in minimum at unit entries. | Objection |
| 03 | Fire & Life Safety | A-301 | IBC 708.3 | 1-hour corridor separation not indicated at Level 2. | Objection |
| 04 | Envelope | A-501 | IECC C402.1.4 | Curtain-wall assembly U-factor not scheduled. | Objection |
| 05 | Occupancy & Area | A-101 | IBC Table 1004.5 | Occupant-load calculation verified. | Cleared |
| 06 | Zoning & Use | C-100 | §12.10 | FAR 2.4 within 2.5 permitted; setbacks conform. | Cleared |
| 07 | Structural | S-200 | IBC 1604.3 | Lateral system and deflection limits documented. | Cleared |
In a demo, PlanCheck checks the set, cites every finding, and writes the Notice of Objections. Compare it with your own review.